Tampa, Florida · Serving the entire state

Solar panel detach & reset for Florida roofing contractors

Panels off before tear-off. Panels back on after the new roof. Florida Solar Reset runs both phases around your roofing crew, with documented condition logs and phase-tagged photo records on every job.

Free contractor accounts — live per-panel pricing and your own scheduling. Already a partner? Your apps live under Apps in the menu.

Crew detaching solar panels from a tile roof ahead of a Florida re-roof

Why roofers hand us the array

  • Roofing contractors are our only customer — we never bid your roof
  • Red (detach) and Green (reset) phases scheduled around your crew
  • Per-panel and per-tile damage counts, issued the same day
  • Florida Building Code wind-load attachment, HVHZ included
  • Branded photo log PDF at closeout, ready for the homeowner file
  • Residential, commercial, and carport arrays statewide

Process

Two phases, bracketed around your roofing crew

Phase 1 — Detach

Every panel is photographed and condition-logged before it is touched. The array, racking, and wiring come off by roof plane, labeled, and panels go to padded racks or a secured trailer. Damage counts for panels, tile, and racking are in your hands the same afternoon.

Between phases — Storage

Panels are never left loose on an open deck overnight. They stay racked and covered on site, or move to secured off-site storage when the roof schedule stretches past the forecast. Chain of custody is photographed at every handoff.

Phase 2 — Reset

Panels go back in their documented positions with new flashing at every penetration, slip sheets under ballast pads, wind-uplift-compliant attachment, torque checks, bonding continuity, and a production check against pre-detach readings.

Scope

Every roof and racking type Florida throws at us

Tile-to-tile re-roofs in South Tampa, membrane recovers in Jacksonville, carport canopies in Miami-Dade under HVHZ rules. If solar is in the way of the tear-off, it is our scope.

All services
  • Concrete and clay barrel tile
  • Flat concrete tile
  • Architectural shingle
  • 5V crimp and standing-seam metal
  • Modified bitumen and built-up low-slope
  • TPO and single-ply membrane
  • Ballasted commercial racking
  • Steel carport canopies

Recent work

Detach & reset jobs across Florida

All projects

The paperwork is the product

Damage claims get settled on documentation, not memory. Every job closes out with a branded photo log PDF: cover page, scope of work, itemized project details, phase-tagged photo pages for pre-detach, detach, reset, and final, plus daily logs with timed notes, damage counts, materials used, and a signed sign-off.

What you get

  • Condition photos of every panel before it is touched
  • Per-panel, per-tile, and per-racking damage counts
  • Materials-needed list the same afternoon as detach
  • Fastener schedule and torque values for the inspector
  • Production readings compared pre-detach and post-reset

FAQ

Solar detach & reset questions from Florida roofers

All detach & reset questions

Got a re-roof with panels in the way?

Send the address, panel count, roof type, and your tear-off date. Dispatch confirms your detach and reset days or counters with the closest that work.